128 KM IN 47 MONTHS
Key figures
Infrastructure :
- 124,6 Km
- 68 communities crossed by the route
- 5 interchanges
- 1 motorway junction with the A13
- 1 motorway interchange with the A88
- 3 rest & picnic areas
- 3 rest & service areas
- 1 operations building
- 1 maintenance centre
- 103 bridges
- 2 major civil engineering structures:
- Le Bec viaduct
- La Risle viaduct
Construction :
- up to1500 staff assigned to the construction site
- 14 million cubic metres of earth transported
- 500 excavation plant (bulldozers, graders, dumper trucks, etc.)
- 100 000 m3 concrete for all civil engineering structures
- 630 000 tonnes de untreated gravel - sand mixture
- 1 500 000 tonnes of asphalt products